Runaway Fire Hydrant Leaves Power Plant in the Dark
Favorites Post #13 (posted in no particular order)
Originally posted May 17, 2014:
Don’t believe it when the Electric Company tells you that the reason your town lost electricity for an hour was because a squirrel climbed onto a transformer and shorted it out. The real reason just may be more bizarre than that and the company doesn’t want you to know all the different creative ways that power can be shut off. This is a tale of just one of those ways. So, get out your pencil and paper and take notes.
One spring day in 1993 while sitting at the Precipitator computer for Unit one at the Coal-fired Power Plant in North Central Oklahoma, while I was checking the controls to make sure all the cabinets were operating correctly, suddenly there was a distant boom, and the lights in the control room went out. The computer stayed on because it was connected to an electric panel called the VSP or Vital Services Panel, which in turn was supplied by the UPS system (Uninterruptible Power Supply). That was one of those moments where you may pause for a moment to make sure you aren’t still at home dreaming before you fly into a panic.
The Precipitator cabinets all indicated on the computer that they had just shutdown. I rose from the chair and walked around to the front of the Alarm Panel for Unit one, and found that the fluorescent lights were only out on Unit 1. The lights were still on for Unit 2. The Control Panel was lit up like a Christmas Tree with Green, Red, Blue and Yellow Lights. The Alarm Printer was spewing out paper at high speed. As the large sheets of paper were pouring out onto the floor, I watched as Pat Quiring and other brave Power Plant Control Room operators were scurrying back and forth turning switch handles, pushing buttons, and checking pressure gauges.
Just this site alone gave me confidence that everything was going to be all right. These Control Room operators were all well trained for emergencies just like this, and each person knew what their job was. No one was panicking. Everyone was concentrating on the task at hand.
Someone told me that we lost Unit 1, and the Auxiliary Power to Unit 1 at the same time. So, Unit 1 was dead in the water. This meant, no fans, no pumps, no lights, no vending machines, no cold water at the water fountain and most importantly, no hot coffee!!! I could hear steam valves on the T-G floor banging open and the loud sound of steam escaping.
I turned quickly to go to the electric shop to see what I could do there in case I was needed. I bolted out the door and down the six flights of stairs to the Turbine-Generator (T-G) basement. Exiting the stairway, and entering the T-G basement the sound was deafening. I grabbed the earplugs that were dangling around my neck and crammed them into my ears. Steam was pouring out of various pop-off valves. I ducked into the electric shop where across the room Andy Tubbs, one of the electric foreman was pulling large sheets of electric blueprints from the print cabinet and laying them across the work table that doubled as the lunch table.
When I asked Andy what happened, I learned that somehow when a crew was flushing out a fire hydrant the water somehow shot up and into the bus work in the Auxiliary Substation (that supplies backup power to the Power Plant) and it shorted out the 189,000 volt substation directly to ground. When that happened it tripped unit 1 and the auxiliary substation at the same time leaving it without power.
I will explain how a fire hydrant could possibly spray the bus work in a substation in a little while, but first let me tell you what this meant at the moment to not have any power for a Power Plant Boiler and Turbine Generator that has just tripped when it was at full load which was around 515 Megawatts of power at the time.
Normally when a unit trips, the boiler cools down as the large Force Draft (FD) Fans blow air through the boiler while the even larger Induced Draft (ID) fans suck the air from the boiler on the other end and blow the hot air up the smoke stack. This causes the steam in the boiler tubes to condense back into water. Steam valves open on the boiler that allow excessive steam to escape.
When the boiler is running there is a large orange fireball hovering in space in the middle of the boiler. The boiler water is being circulated through the boiler and the Boiler Feed Pump Turbines are pumping steam back and forth between the turbine generator and the boiler reheating the steam until every bit of heat from the boiler that can be safely harnessed is used.
When all this stop suddenly, then it is important that the large fans keep running to cool down the steam, since it is no longer losing energy in the generator as it was when it was busy supplying electricity to 1/2 million people in Oklahoma City. The power is fed to the fans from the Auxiliary substation located right outside the Main Switchgear where all the breakers reside that supply the power to the fans. Unfortunately, in this case, the Auxiliary substation was shutdown as well, leaving the boiler without any fans.
Without fans for cooling, and pumps to circulate the water, the walls of the boiler began heating up to dangerous temperatures. Steam was whistling out of pop off valves, but if the steam drum on the top of the boiler were to run dry, then the entire boiler structure could be compromised and begin melting down. — So, this was serious. Something had to be done right away. It wouldn’t be as bad as the China Syndrome since we were burning coal instead of nuclear power, but it would have caused a lot of damage nonetheless.

From the movie “The China Syndrome” where a similar emergency existed only in the movie, it was a Nuclear Plant
I have a side story about this picture, but I think I’ll save it for another post because I don’t want to digress from the main story at this point (Ok. Let me just say “Jack Maloy and Merl Wright” for those who can’t wait. See the post: “Power Plant Conspiracy Theory“).
With the prospect that the boiler might melt to the ground in a pile of rubble, it would seem that the main priority was to turn the Auxiliary Substation back on so the fans could be turned back on and prevent the boiler from collapsing. So, we walked out to the substation and looked at the switches that would have to be operated in order to first power up the main bus and then to close to supply power to the two big transformers and the six smaller transformers that supplied the Unit 1 Main Switchgear.
While inspecting the switches where the electricity had gone to ground we found that one of the main insulators was cracked.
Since this insulator was cracked, we didn’t really want to operate the switch to test if another 189,000 volts would go straight to ground again, especially since one of us would be standing right underneath it cranking the switch. So, we went back to the shop to find an alternative.
By this time the Plant Manager, Ron Kilman arrived in the shop, and understanding the urgency to find a solution asked us what were the alternatives. He was relying on our expertise to make the decision.
The other solution would be to cut the power over from Unit 2 which was still humming away pushing electricity to Oklahoma City out of the 345,000 volt substation. The cut over would be very simple because the switchgear was designed with this in mind. We analyzed the power rating on the auxiliary transformers on Unit 2 and thought that we might be cutting it close to have them running both sets of fans at the same time, especially since the full load amps of a huge fan starting up was about 10 times the normal rate.
The transformer was rated to handle the load, but consider this. What if this caused Unit 2 to trip as well. With the Auxiliary substation offline, if Unit 2 tripped, we would be in twice the amount of trouble we were currently in. What a day it would have been if that had happened and two 250 foot boilers had come crashing to the ground in a pile of rubble. After reading the power ratings on the auxiliary transformers I was thinking, “Yeah, let’s do it! These transformers can handle it.” Andy was not so eager.
So, we were left with one alternative. That was to shut the switch in the Auxiliary substation that had the cracked insulator and take our chances that it wasn’t going to short to ground and blow up over our heads. I think I was eager to close the switch for Andy, but if I remember correctly, he didn’t want me to be the one to suffer the consequences and decided to close the switch himself. Needless to say. Andy closed the switch, and nothing blew up.
As soon as the power was restored to the switchgear, the fans were powered up and the temperature in the boiler was quickly reduced. The coffee pot in the Electric Shop began heating the coffee again. The power plant was saved from a major catastrophe. That was delayed for another day… of which I will talk about later (see the post “Destruction of a Power Plant God).”
So, how exactly does a fire hydrant shoot water up into the bus work of a substation like the picture of the switch directly above? The culprit fire hydrant wasn’t in the substation, it sat alongside it outside the fence a good 50 feet from the high voltage switch. No hose was attached to the fire hydrant. It was only being flushed out as part of a yearly activity to go around and make sure the fire hydrants are all operating correctly.
Here is the story about how the squirrel climbed into the transformer this time….
George Alley, Dale Mitchell and Mickey Postman were going around to the 30,000 fire hydrants on the plant ground (ok. maybe not that many, but we did have a lot of them), and they were opening up the valves and flushing them out. That means, they were letting them run for a while to clear them out from any contaminates that may have built up over the year of not being used.
Throughout their adventure they had opened a multitude of Hydrants situated out in the fields along the long belt conveyor from the coalyard and around the two one-million gallon #2 Diesel tanks.
The brave Power Plant Men, learned that when opening a fire hydrant wide open in the middle of field had unintended consequences. It tended to wash out the ground in front of the flow of the water shooting out of the hydrant. So the team of experts devised a plan to place a board in front of the hydrant when it would be in danger of tearing a hole in the terrain. The board would divert the water into the air where it would fan out and not cause damage to the surrounding area.
This was working fine, and when they arrived at the fire hydrant next to the substation, since the stream from the hydrant was pointing directly into the substation (hmm. a design flaw, I think), they decided to prop the board up against the fence to keep from washing away the gravel in the substation. Well. When a fire hydrant is opened that hasn’t been used for a year, the first flow of water to shoot out is dark brown.
You may think that this is because the water has somehow become dirty over the past year, but that isn’t quite the case. What has happened is that the pipe has been rusting little by little and the water has become saturated with the rust. So, the water shooting out of the hydrant was full of rust (hence the need to flush them out).
Well. Rust is made of metal. Metal is conductive, especially when it is mixed with water. When the water hit the board, it was deflected into the air and happened to direct itself directly into the high voltage switch in the substation. This caused a circuit to the ground which, once it created an arc pumped all the electricity directly into the ground.
Normally when something like this happens it doesn’t trip the Main Power Transformer to a Power Plant.
This time it did. I know there was a few heads scratching trying to figure it out. I think I figured out what happened a little while later. You see… here is the rest of the story….
Once the unit was back online and the emergency was over, someone finally noticed that the telephone system couldn’t call outside of the plant. Well. I was the main telephone person at the time, so the control room called me and asked me to look into the problem.
I checked the telephone computer and it was up and running just fine. Internal calls could be made. Only any call outside just concluded with a funny humming sound. After checking the circuit in the Logic Room next to the Rolm Telephone Computer I headed for…. guess where….. the Main Switchgear….
In the middle of the main switchgear in the back of the room right next to the Auxiliary Substation beyond the back wall, the outside telephone line came into the plant. The first thing it did was go through a special Telephone Surge Protector.
In this picture above, the silver circular buttons on the left side are really an old style surge protector. whenever there was a power surge, the carbon connection in the surge protector would quickly melt causing the circuit to go straight to ground. Thus protecting the rest of the telephone circuit. So, if some kid in their house decides to connect the 120 volts circuit to the telephone for fun to see what would happen, this circuit would protect the rest of the phone circuits. Keep in mind that this was during the early 1990 when “Surge Protection” still was basically all “mechanical”.
Anyway, when I arrived at this panel and I checked the surge protector to the main line going out of the plant, guess what I found…. Yep. Shorted to ground. Luckily there were some spares that were not wired to anything in the panel and I was able to swap them out for the ones that had been destroyed. — These were a one time use. Which meant, if they ever had to short to ground, they had to be replaced.
Ok. Fine. After a little while, we were able to call back out of the plant, though there was still some residual noise on the line. It was like this… when you called out of the plant, the person on the other end sounded like they were buried in a grave somewhere and they were trying to talk to someone living just like in an episode of the Twilight Episode where a phone line landed on a grave and the dead person tried to call his long lost love from the past.
I didn’t give it much thought other than that I figured the 189,000 volt arc to ground must have shorted out the telephone line since the phone line ran directly under the auxiliary substation ground grid.
It wasn’t until the next morning when the Southwestern Bell repairman showed up at the plant. I knew him well, since he had been working on our phone lines since before the AT&T breakup in 1984. When I met him in the front of the electric shop, he said that he needed to check our telephone circuits. I told him that I knew that we had a problem because we had a high voltage short to ground yesterday and I found our surge protectors melted away.
He explained to me that not only was our circuit affected, but that every relay house from here to Ponca City was blown out. That’s when I realized that the problem was the reverse of the usual situation. What had happened was that the Ground Grid in the substation and the surrounding area (including the Unit 1 Main Power Transformer) had become hot. What do you do when the ground grid becomes charged?
The Ground Grid is what is supposed to protect you when a surge happens, but what happens when the ground grid itself is the problem? In this case, when the high voltage line about 60 feet from the telephone cable surge protector, arced to ground, it fed a tremendous amount of power back through the ground grid. when equipment detected the surge in voltage, they automatically defaulted their circuits to ground. That’s why the telephone circuit died. That’s what tripped the Main Power Transformer.
When the telephone circuit detected the high voltage surge, it shorted to ground (which was the problem), causing the high voltage to feed directly into the phone line and down the line to the next Southwestern Bell relay switch, which also defaulted to ground, trying to bleed off the surge as it went from relay switch to switch until enough of the power was able to be diverted to ground.
That day sure turned out to be a learning experience. I learned that when all the lights go out in the control room, that it is almost assured that the coffee pot in the electric shop is going to stop working. I also learned that in order to coax the plant manager to the electric shop, a major electrical tragedy is one good way. I learned that when shooting rusty water into the air don’t point it at a high voltage auxiliary substation switch. — I’m sure Mickey Postman learned that lesson too. I also learned that just like in Star Trek… whenever there is a dangerous job to do, the Captain is always the one that wants to do it. Does that make sense? Send a Peon like me in there…
I also learned something else about Power Plant Men…. You see…. People like Dale Mitchell, George Alley and Mickey Postman all are examples of incredibly wonderful Power Plant Men. When they were out there doing their duty and something tragic like this, all the Power Plant Men felt their pain. They knew that they all felt guilty for tripping the unit. It didn’t matter that a million dollars every so many minutes was walking out the door in revenue. The only thing that mattered was that these three men were safe.
Since I have left the Power Plant, I have found that the idea that the employee is the greatest asset that a company can possess is not a universal idea. You see, there was never the thought that any of these people should be fired for their mistake. On the contrary. The true Power Plant Men did whatever they could to let them know that they knew exactly how they felt. It could have happened to any of them.
Besides the friendship between Power Plant Men, one of the things I miss most about working at the Power Plant is that the employees are held in high esteem as a real asset to the company. Many could learn from their example.
Comments from the Original post
-
-
I like the mix of storytelling and information sharing you deliver here. Thanks again
-
-
-
Aug 8, 2011 I lost all reserve in and lost both units in 2 separate storms and A1 would not start for a few minutes and A2 was leaking antifreeze terribly not a scratch and back online in 34 hours both units and no one ever asked me one question even with a Safety Dept not one question asked of me the SS on duty. Not many men on the planet have ever experienced an uncontrolled total plant outage- you would of thought a learning opportunity would of took place. Feb 2011 worst winter temps in years 50 Units or more tripped in Texas let alone the trusty units of Redbud and McClain were fighting Sooner rolled right along with storm warnings for two weeks ahead – the ICS still went to Detroit for just tours of other facilities once again the fall guy Tarver McArthur stood alone. I had authored a Freeze Protection Plan for the plant and that seemed to save the day and explain to the regulatory bodies how we were online and everyone else in Texas was off and enjoying rolling blackouts in a terrible winter weather situation not to mention our powers that be were all stranded in Detroit and very few people could get to the plant without getting stuck trying to get there as well – but a few health heart issues later I am still here to tell about it all you would think folks would want to take advantage of someone that had went through the fire and Ice but thats ok I want them someday distant to get all the credit they deserve when the trumpets sound as that is truly what matters most. DT
-
-
Great story, and yes, you took exactly the proper lesson from it, and it is too bad that many of our bosses haven’t learned it.
And yup, I’ve buried a lot of electrocuted squirrels over the years.
From Power Plant Rags To Riches
Originally posted on March 9, 2013:
There is one item that all Oklahoma power plant men carry with them almost every day. Whether they are electricians working on a motor, a mechanic pulling a pump, or an operator making his rounds. All of them carry and use this one item. It is so important that, without it, it would be difficult for the maintenance shop to function properly.
This item of course is a rag from the Chief Wiping Cloth Rag Box:
As an electrician, I used rags all the time. Whether I was working on a breaker, doing battery inspection, elevator maintenance or just looking for a clean place to sit my back side, I had to have a rag from the box of Chief Wiping Cloths. Chief Wiping Cloths come from the Oklahoma Waste & Wiping Rag Company in Oklahoma City.
When I was on the labor crew, I was dirty all the time. I was doing coal clean-up, digging ditches, pouring concrete, shoveling bottom ash and wading through fly ash. I had little reason to stay clean or to clean things. My life was full of dirt and grime. I was always dirty, so much so that when I went into the electric shop in 1983 and Bill Bennett was talking to Charles Foster about who should repair the Manhole pump motors, Bill told Charles, “Let Kevin do it. He enjoys getting dirty.”
I didn’t argue with Bill, because, well…. what was the point. But as an electrician, I not only had desired to have a cleaner job, but I also wished to fulfill Jerry Mitchell’s prophesy that “When I become as good as him, I will be able to remain clean even in the face of “Coal Dust and Fly Ash” (See the post A Power Plant Man Becomes an Unlikely Saint). The boxes of rags were my opportunity.
So, when I left to go on a job, I would always grab at least a couple of rags from the box and put them in my tool bucket and at least one hanging out of my back pocket. That way, if I needed to plop down on the ground to unwire a motor too low to sit on my bucket, I could sit on a rag on the coal dust covered ground instead. This helped my goal of remaining as clean as possible.
It’s funny that years later I should miss the boxes of rags that I used to use to do my job. There was more to it than just the rags I used to wipe my hands, battery posts, greasy bearings, breaker parts and my nose. You see, these rags were made from recycled clothes. Yes. They were sterilized for our use, but these were from recycled clothes.
Actually, the Oklahoma Waste and Wiping Rag Company, founded in 1940, was one of the largest purchasers of donated clothing in the country. That meant that many of the rags we used in the rag box were actually worn by someone. Sure, a lot of the rags came from defective clothing from factories, but some of the rags had been clothes actually worn by a person.
As odd as it may sound, while I was grabbing rags from the rag box, I was thinking (at times… it wasn’t like it was an obsession with me), that these rags may have been worn by someone for years before ending up covered with bearing grease by my hand and tossed into a proper Fire protection trash can.

Trash cans like this were used because they prevented oily rags from burning down the shop when they would spontaneously “combust”
So, anyway….. Thinking about how these rags were possibly once worn by people throughout the United States, I felt that some of the rags had a specific connection to some unknown person somewhere. So, I would actually go through the rag box looking for pieces of rags that I felt had been worn by someone before. You know (or maybe you don’t), rags that had an aura around them like someone had once had a “personal relationship” with them.
I would take these rags and I would “pseudo-dress up” in them. So, if it was a rag made out of a pair of pants, I would tuck it in my belt and I would carry it that way until I needed it. In a weird way (and I know… you are thinking a “really weird” way), I would feel connected to the person that had worn this piece of clothing in the past. I felt as if I was honoring their piece of cloth just one last time before I stained it with coal dust, fly ash, or snot, just one last time.
And in my even weirder way, I would sort of pray for that person, whoever they may be. I would even, kind of, thank them for the use of their old clothes (I know, I stretched the English Language in those last two sentences to meet my unusual need).
I have a picture in my mind of myself standing on the platform of the 6A Forced Draft Fan at Muskogee in the fall of 1984 (one year after becoming an electrician), dressing myself up in pieces of clothing from the rag box, all giddy because I had found enough pieces to make an entire outfit made of half male and half female clothing. Ben Davis, who was on overhaul at Muskogee with me from our plant is shaking his head in disbelief that he had to work with such a goof. Not exactly sure who he has been assigned to work with… — I actually felt sorry for Ben. I knew I was a normal person. The trouble was… I was the only person that knew it (For an explanation about where that phrase originated, see the post “Bobbin’ Along with Bob Kennedy“).
Levity is healthy. And at times when stress is at its greatest, levity is a way back to sanity. Just today I was invited to a conference call to discuss something that I was working on, and when I was done, I stayed on the line even though I was no longer needed. As I listened, one person on the other end was remarking about how he enjoyed his team so much because they were able to crack up and reduce the stress by being humorous.
A friend of mine, and fellow teammate Don McClure who had invited me to the call was coming up with one “one-liner” after the other. They were “spot-on” and very funny (as he usually is — ok. He’s going to correct me on the “usually” part). But he said one thing that hit home with me. He said that he had been in the Hot-seat so long that he had to put on a pair of Asbestos underwear.
This, of course, made me immediately think of the asbestos gloves we used to wear in the electric shop before Asbestos had been formerly outlawed. We had an old pair of asbestos gloves from Osage Plant ( to find out more about the Osage Plant read about it in the post Pioneers Of Power Plant Fame Finally Find Peace).
Along with the rags in the rag box, when I used to put on the asbestos gloves I used to think of Howard Chumbley (who died on August 4, 1998 at the age of 70), at the age of 24 working at the Osage Plant, before his hair turned to gray and then to white, wearing these same gloves while he pulled a bearing off of a heater and slapped it onto a motor shaft.
It gave a special meaning to motor repair. Even though Howard retired from plant life in 1985, for years I could put on his old pair of asbestos gloves and feel like I was stepping into his young shoes. I would think… If only I could be a true “Power Plant Man” like Howard…. I love Howard with all my heart, and today, I have never met a better human being than him.
Note that in the picture of Howard’s gravestone it says that he was an EM3 in the Navy. This is an “Electrician’s Mate 3rd Class”. There is no way I was ever going to measure up to Howard. He was a hero to his country and a man of great integrity and humility. If I had saved up all the nice things I had done in my life and done them all on one day, I may have slightly resembled Howard on a regular day. Just like Jim Waller that I had discussed in my last post… Only Men of the greatest integrity measure up to be “True Power Plant Men”.
This made changing the bearings on a motor almost a sacred event to me. I don’t know if the other electricians felt what I felt, but there was something about placing those gloves on my hands that seemed to transform me for a moment into someone noble. I never mentioned it to them (which was odd, because I was usually in the habit of telling them every little crazy thought that entered my head).
I remember at break time one day Margie Belongia (who was a plant janitor at the time) telling me in 1981 when I was a summer help, that she wanted to go to hell because that was where all of her friends would be. I asked her at the time how she was so certain that being in hell guaranteed that she would be able to be with her friends, and she was taken aback by my question. “What do you mean? Why wouldn’t I be with my friend?” — I responded, “Suppose in hell you are alone. With no one but yourself.” I think I unnerved her by my response. She said that she had never considered that. She had counted on being with her friends. They had all decided that was the way it was going to be.
At any rate. I kept her thought in my mind. I hope every day that someday I will be able to walk up behind Howard Chumbley (not in hell of course, the other place) and just stand there and listen to him tell stories about when he worked at the old Osage Plant, and how he used to be up to his elbows in oil that contained PCBs and never thought twice about it. Or how he played a harmless joke on someone dear to him, and he would laugh….
Howard was my foreman for only about 5 months before he retired. I remember sitting in the electric shop office for a year and a half during lunch listening to him tell his stories. He would grin like Andy Griffith and laugh in such a genuine way that you knew that his heart was as pure as his manners.
To this day I know that I have never been richer than I was when I was able to sit in the shop and listen to Howard Chumbley pass on his life experience to us. Even years later when I was able to slip on the pair of Asbestos Gloves worn by him years earlier I could feel that I was following in his footsteps. Just the thought of that would make me proud to be an Electrician in a Power Plant.
I used to imagine that the Chief on the Chief rag boxes knew the history of all the pieces of rags in the box. When I moved to Texas in 2001, I used some sturdy Chief rag boxes when I was packing to leave. They are sturdy boxes. Just this past year, we threw away the last Chief rag box that contained Christmas decorations in exchange for plastic tubs. Even though it seems like a little thing. I miss seeing the Chief on those boxes of rags.
Importance of Power Plant Backup Battery Preventative Maintenance
The very last thing I ever learned in High School was the importance of Backup Battery Preventative Maintenance. In fact, the entire senior class of 1978 at Rockbridge High School in Columbia, Missouri learned this lesson at the same time. It was during the graduation ceremony in May while the students were walking across the stage to receive their diplomas.
I had already received mine and I was back in my seat sitting between Tracy Brandecker and Patrick Brier (we were sitting alphabetically. My last name is Breazile). Pat was sitting on my left and Tracy was on my right. We were grinning from ear-to-ear to be graduating. My friends from the second grade, Mark Schlemper, Russell Somers and Brent Stewart had just walked across the stage in the gymnasium while a storm raged outside. As my friend from the fifth grade forward, Matt Tapley was walking across the stage there was a loud crack of thunder and the sound of an explosion as the lights went out.
Matt Tapley has albinism, giving him white hair and skin. In his black robe, the entire class witnessed Matt’s head bobbing up and down in the faint light given off from the emergency lights to either side of the stage as he was bowing to his classmates. We all clapped. The clapping soon turned to laughter as the emergency lights quickly dimmed and went entirely out within a minute.
As we sat in total darkness waiting for some resourceful faculty member to make their way to the hidden fallout shelter in the basement of the school to retrieve the portable generator and a spotlight, I was amazed by how quickly the emergency lighting had failed. The transformer to the school had been destroyed by the lightning strike so we finished the ceremony by the light of the large spotlight from the back of gym. My thought was that the school is only 4 years old and already the emergency lighting is too old to stay lit long enough to even begin evacuating the building, if that was what we had intended to do.
Fast forward to the spring of 1984. I had become an electrician a few months earlier. As I was learning the electrical ropes, I learned the importance of Preventative Maintenance in a power plant setting. The majority of an electrician’s job when I first joined the electric shop was doing “Preventative Maintenance”. I have some horror stories of bad preventative maintenance that I will share much later. I will point out now that most Americans know of some stories themselves, they just don’t realize that the root cause of these major failures were from a lack of preventative maintenance.
A power plant, like the emergency lights in the High School, has a battery backup system, only it is on a grand scale. There are backup batteries for every system that needs to remain online when there is a total blackout of power. These batteries needed to be inspected regularly. We inspected them monthly.
At first, I had done battery inspections with various electricians. Some people didn’t seem to take this task very seriously. I remember that when I did the inspections with Mike Rose, he usually finished by taking a gallon of soda water (a gallon of water with a box of baking soda dissolved into it) and pouring it all over the batteries.
My bucket buddy, Diana Lucas (Dee), on the other hand, took a different approach. We carefully filled each cell with just the right amount of distilled water. Then she showed me how to meticulously clean any corrosion from the battery posts using a rag soaked in the soda water, and then she would paint the area on the post where the corrosion was with No-Ox grease.
When I say batteries, you may think that I’m talking about batteries like you have in your car, or even in a large piece of equipment like a big dirt mover. Some of the batteries were the size of a battery used in a large dozer or dirt mover:
Some of the batteries that we inspected were of this type. They were usually hooked up to generators that could be started up in case all the power was out and we needed to start up a diesel generator. However, this was just the puppies when it came to the Station Power Batteries. These were some serious batteries:

These are the type of UPS Station batteries used at the plant. The battery shown on the left is about the size of a small file cabinet
As big as these batteries are, it takes 58 of them for each system to come up with a 130 volt circuit. That’s right. 58 of these batteries all in a series. The station batteries are all in rooms by themselves known as…. “Unit 1 and Unit 2 Battery rooms”. Smaller station battery sets are found at different locations. Today, those places include the relay house in the main substation, the Microwave room on the roof of #1 boiler. The River pumps, the radio tower building, the coalyard switchgear, Enid Turbine Generators and the Co-Generation plant in Ponca City. I’m sure I’m leaving some out. Maybe a current electrician at the plant can remind me of the others in a comment below. Each of these locations have approximately 58 station batteries.
While I was still a novice electrician, one morning in May I was told that I was going with Dee and Ben Davis to Enid to a Battery training class at an electric company office where the manufacturer (C&D) was going to go over the proper maintenance of the station batteries. Ben drove the pickup. I remember sitting in the middle between Dee and Ben both going and coming back from our lesson on Battery Preventative Maintenance….
Interesting that Ben was sitting to my left and Dee to my right that day… just like Pat and Tracy during the graduation ceremony 6 years earlier to the month when we first learned the impact of bad preventative maintenance on backup batteries. This time we were learning how to prevent the problem I had witnessed years before. I don’t know why I draw parallels like that. It just seem to make life a little neater when that happens. I don’t remember Ben and Dee grinning ear-to-ear like Pat and Tracy were the night we graduated from High School, but I can assure you, I was grinning the entire 45 minutes going to Enid and the 45 minutes going back to the plant.
Since I had been trained for battery maintenance, I suppose it was like Andy Griffith becoming the Permanent Latrine Orderly (PLO) in the movie “No Time For Sergeants”. I was able to go to town inspecting all kinds of backup batteries.
Gene Roget (pronounced with a french accent as “Row Jay” with a soft J) was a contract electrician when I first became an electrician in the shop. I wrote about him in the post New Home in the Power Plant Electric Shop. He was a great mentor that taught me a lot about how to be an electrician. He taught me how to use all the different tools in my tool bucket. He taught me how to bend conduit and make it come out the right length on both ends…
He especially taught me the importance of doing a “pretty” job when running wire or conduit or just rewiring a motor. I remember Gene stopping one day when we were walking to the precipitator and he paused to look up at the transfer tower. I asked him where he was looking. He said, “I’m just admiring the wonderful job someone did bending that set of conduit. that’s a perfect job! Just perfect!”
Anyway, Gene and I were given the task of checking all the batteries in the emergency lights throughout the plant. It happened that the emergency lights at the plant were all about 5 years old. Probably about the same age as the lights were in the high school the night of our graduation. The lights in the plant had wet cells. Which meant that you had to add distilled water to them like you do in your car, or in the station batteries. This amounted to a pretty large task as there were emergency lights stationed throughout the plant.
We found many of the lights that would never have been able to light up enough to cause a cockroach to run for cover. We took the bad ones back to the shop to work on them. A lot of the batteries had gone bad because they had never been checked. They have a built-in battery charger, and some of the chargers were not working. I drew a wiring diagram of the charger so that we could troubleshoot them and replace components that had gone bad.
All of this was like a dream to me. At the time I couldn’t think of any other place I would rather be. I loved taking things that were broken and fixing them and putting them back into operation. Eventually we decided to change the emergency light batteries to dry batteries. Those didn’t need water. We could pull out the six wet cells from each emergency light box and just plug the new batteries in place. This made a lot more sense. Who has time to go around regularly and check 50 or 60 emergency lights every 3 months? Not us. Not when we were trying to save the world.
Back to the Station Batteries:
Just to give you an idea of how important these batteries are, let me tell you what they are used for…. Suppose the power plant is just humming along at full power, and all of the sudden, the power goes out. It doesn’t matter the reason. When there is a blackout in a city, or a state, be assured, the power plant itself is in a blackout state as well. After all, the power plant is where the electricity is being created.
In the plant there is large equipment running. The largest and most valuable piece of equipment by far in a power plant is the Turbine Generator. The entire plant exists to spin this machine. As big as it is, it spins at 3600 revolutions per minute, or 60 times each second. In order to do that, oil has to be flowing through the bearings otherwise they would burn up almost instantly. This would cause the generator to come to a screeching halt — and I mean “screeching!”

A turbine Generator Room at a nuclear power plant with a waxed floor! When I was a janitor I would wax the T-G floor.
So, in order to stop a turbine generator properly, when a unit is taken offline, once it has coasted to a smooth stop, the turbine has to be engaged to something called a “Turning Gear” which slowly rotates the turbine generator. This is turned off only when the shaft has cooled down. Without this, you might as well call General Electric and order a new one.
So, one of the most important things the station batteries do is run emergency oil pumps that engage immediately when the power is cutoff from the plant. This allows the turbine generator and other important equipment throughout the plant to slowdown and come to a stop gracefully in case the power is instantly gone.
I will write a story later about a day when this happened at our plant. The moments of confusion, and the quick decisions that had to be made to keep the unit 1 boiler from melting to the ground. Rest assured that throughout this time, the emergency oil pumps had kicked in. The station batteries did their job when they were called upon. While the control room operators were performing their emergency tasks to the letter and the electricians were scrambling to come up with a workable solution to an unforeseen problem, the turbine-generator, the PA (Primary Air) fans, the FD (Forced Draft) Fans, the ID (Induction) fans were all coasting down as the groundwork was being laid to quickly restore power.
Someone in an office in the middle of Oklahoma City may have noticed their lights flicker for a moment. Maybe they dimmed slightly…
If not for the proper maintenance of the power plant station batteries, the lights would have possibly gone dark. Someone would have had to go looking for the portable generator and the spotlight. Ceremonies in progress may have to continued under candlelight.
Runaway Fire Hydrant Leaves Power Plant in the Dark
Originally posted May 17, 2014:
Don’t believe it when the Electric Company tells you that the reason your town lost electricity for an hour was because a squirrel climbed onto a transformer and shorted it out. The real reason just may be more bizarre than that and the company doesn’t want you to know all the different creative ways that power can be shut off. This is a tale of just one of those ways. So, get out your pencil and paper and take notes.
One spring day in 1993 while sitting at the Precipitator computer for Unit one at the Coal-fired Power Plant in North Central Oklahoma, while I was checking the controls to make sure all the cabinets were operating correctly, suddenly there was a distant boom, and the lights in the control room went out. The computer stayed on because it was connected to an electric panel called the VSP or Vital Services Panel, which in turn was supplied by the UPS system (Uninterruptible Power Supply). That was one of those moments where you may pause for a moment to make sure you aren’t still at home dreaming before you fly into a panic.
The Precipitator cabinets all indicated on the computer that they had just shutdown. I rose from the chair and walked around to the front of the Alarm Panel for Unit one, and found that the fluorescent lights were only out on Unit 1. The lights were still on for Unit 2. The Control Panel was lit up like a Christmas Tree with Green, Red, Blue and Yellow Lights. The Alarm Printer was spewing out paper at high speed. As the large sheets of paper were pouring out onto the floor, I watched as Pat Quiring and other brave Power Plant Control Room operators were scurrying back and forth turning switch handles, pushing buttons, and checking pressure gauges.
Just this site alone gave me confidence that everything was going to be all right. These Control Room operators were all well trained for emergencies just like this, and each person knew what their job was. No one was panicking. Everyone was concentrating on the task at hand.
Someone told me that we lost Unit 1, and the Auxiliary Power to Unit 1 at the same time. So, Unit 1 was dead in the water. This meant, no fans, no pumps, no lights, no vending machines, no cold water at the water fountain and most importantly, no hot coffee!!! I could hear steam valves on the T-G floor banging open and the loud sound of steam escaping.
I turned quickly to go to the electric shop to see what I could do there in case I was needed. I bolted out the door and down the six flights of stairs to the Turbine-Generator (T-G) basement. Exiting the stairway, and entering the T-G basement the sound was deafening. I grabbed the earplugs that were dangling around my neck and crammed them into my ears. Steam was pouring out of various pop-off valves. I ducked into the electric shop where across the room Andy Tubbs, one of the electric foreman was pulling large sheets of electric blueprints from the print cabinet and laying them across the work table that doubled as the lunch table.
When I asked Andy what happened, I learned that somehow when a crew was flushing out a fire hydrant the water somehow shot up and into the bus work in the Auxiliary Substation (that supplies backup power to the Power Plant) and it shorted out the 189,000 volt substation directly to ground. When that happened it tripped unit 1 and the auxiliary substation at the same time leaving it without power.
I will explain how a fire hydrant could possibly spray the bus work in a substation in a little while, but first let me tell you what this meant at the moment to not have any power for a Power Plant Boiler and Turbine Generator that has just tripped when it was at full load which was around 515 Megawatts of power at the time.
Normally when a unit trips, the boiler cools down as the large Force Draft (FD) Fans blow air through the boiler while the even larger Induced Draft (ID) fans suck the air from the boiler on the other end and blow the hot air up the smoke stack. This causes the steam in the boiler tubes to condense back into water. Steam valves open on the boiler that allow excessive steam to escape.
When the boiler is running there is a large orange fireball hovering in space in the middle of the boiler. The boiler water is being circulated through the boiler and the Boiler Feed Pump Turbines are pumping steam back and forth between the turbine generator and the boiler reheating the steam until every bit of heat from the boiler that can be safely harnessed is used.
When all this stop suddenly, then it is important that the large fans keep running to cool down the steam, since it is no longer losing energy in the generator as it was when it was busy supplying electricity to 1/2 million people in Oklahoma City. The power is fed to the fans from the Auxiliary substation located right outside the Main Switchgear where all the breakers reside that supply the power to the fans. Unfortunately, in this case, the Auxiliary substation was shutdown as well, leaving the boiler without any fans.
Without fans for cooling, and pumps to circulate the water, the walls of the boiler began heating up to dangerous temperatures. Steam was whistling out of pop off valves, but if the steam drum on the top of the boiler were to run dry, then the entire boiler structure could be compromised and begin melting down. — So, this was serious. Something had to be done right away. It wouldn’t be as bad as the China Syndrome since we were burning coal instead of nuclear power, but it would have caused a lot of damage nonetheless.

From the movie “The China Syndrome” where a similar emergency existed only in the movie, it was a Nuclear Plant
I have a side story about this picture, but I think I’ll save it for another post because I don’t want to digress from the main story at this point (Ok. Let me just say “Jack Maloy and Merl Wright” for those who can’t wait) See the post: “Power Plant Conspiracy Theory“.
With the prospect that the boiler might melt to the ground in a pile of rubble, it would seem that the main priority was to turn the Auxiliary Substation back on so the fans could be turned back on and prevent the boiler from collapsing. So, we walked out to the substation and looked at the switches that would have to be operated in order to first power up the main bus and then to close to supply power to the two big transformers and the six smaller transformers that supplied the Unit 1 Main Switchgear.
While inspecting the switches where the electricity had gone to ground we found that one of the main insulators was cracked.
Since this insulator was cracked, we didn’t really want to operate the switch to test if another 189,000 volts would go straight to ground again, especially since one of us would be standing right underneath it cranking the switch. So, we went back to the shop to find an alternative.
By this time the Plant Manager, Ron Kilman arrived in the shop, and understanding the urgency to find a solution asked us what were the alternatives. He was relying on our expertise to make the decision.
The other solution would be to cut the power over from Unit 2 which was still humming away pushing electricity to Oklahoma City out of the 345,000 volt substation. The cut over would be very simple because the switchgear was designed with this in mind. We analyzed the power rating on the auxiliary transformers on Unit 2 and thought that we might be cutting it close to have them running both sets of fans at the same time, especially since the full load amps of a huge fan starting up was about 10 times the normal rate.
The transformer was rated to handle the load, but consider this. What if this caused Unit 2 to trip as well. With the Auxiliary substation offline, if Unit 2 tripped, we would be in twice the amount of trouble we were currently in. What a day it would have been if that had happened and two 250 foot boilers had come crashing to the ground in a pile of rubble. After reading the power ratings on the auxiliary transformers I was thinking, “Yeah, let’s do it! These transformers can handle it.” Andy was not so eager.
So, we were left with one alternative. That was to shut the switch in the Auxiliary substation that had the cracked insulator and take our chances that it wasn’t going to short to ground and blow up over our heads. I think I was eager to close the switch for Andy, but if I remember correctly, he didn’t want me to be the one to suffer the consequences and decided to close the switch himself. Needless to say. Andy closed the switch, and nothing blew up.
As soon as the power was restored to the switchgear, the fans were powered up and the temperature in the boiler was quickly reduced. The coffee pot in the Electric Shop began heating the coffee again. The power plant was saved from a major catastrophe. That was delayed for another day… of which I will talk about later (see the post “Destruction of a Power Plant God).”
So, how exactly does a fire hydrant shoot water up into the bus work of a substation like the picture of the switch directly above? The culprit fire hydrant wasn’t in the substation, it sat alongside it outside the fence a good 50 feet from the high voltage switch. No hose was attached to the fire hydrant. It was only being flushed out as part of a yearly activity to go around and make sure the fire hydrants are all operating correctly.
Here is the story about how the squirrel climbed into the transformer this time….
George Alley, Dale Mitchell and Mickey Postman were going around to the 30,000 fire hydrants on the plant ground (ok. maybe not that many, but we did have a lot of them), and they were opening up the valves and flushing them out. That means, they were letting them run for a while to clear them out from any contaminates that may have built up over the year of not being used.
Throughout their adventure they had opened a multitude of Hydrants situated out in the fields along the long belt conveyor from the coalyard and around the two one-million gallon #2 Diesel tanks.
The brave Power Plant Men, learned that when opening a fire hydrant wide open in the middle of field had unintended consequences. It tended to wash out the ground in front of the flow of the water shooting out of the hydrant. So the team of experts devised a plan to place a board in front of the hydrant when it would be in danger of tearing a hole in the terrain. The board would divert the water into the air where it would fan out and not cause damage to the surrounding area.
This was working fine, and when they arrived at the fire hydrant next to the substation, since the stream from the hydrant was pointing directly into the substation (hmm. a design flaw, I think), they decided to prop the board up against the fence to keep from washing away the gravel in the substation. Well. When a fire hydrant is opened that hasn’t been used for a year, the first flow of water to shoot out is dark brown.
You may think that this is because the water has somehow become dirty over the past year, but that isn’t quite the case. What has happened is that the pipe has been rusting little by little and the water has become saturated with the rust. So, the water shooting out of the hydrant was full of rust (hence the need to flush them out).
Well. Rust is made of metal. Metal is conductive, especially when it is mixed with water. When the water hit the board, it was deflected into the air and happened to direct itself directly into the high voltage switch in the substation. This caused a circuit to the ground which, once it created an arc pumped all the electricity directly into the ground.
Normally when something like this happens it doesn’t trip the Main Power Transformer to a Power Plant.
This time it did. I know there was a few heads scratching trying to figure it out. I think I figured out what happened a little while later. You see… here is the rest of the story….
Once the unit was back online and the emergency was over, someone finally noticed that the telephone system couldn’t call outside of the plant. Well. I was the main telephone person at the time, so the control room called me and asked me to look into the problem.
I checked the telephone computer and it was up and running just fine. Internal calls could be made. Only any call outside just concluded with a funny humming sound. After checking the circuit in the Logic Room next to the Rolm Telephone Computer I headed for…. guess where….. the Main Switchgear….
In the middle of the main switchgear in the back of the room right next to the Auxiliary Substation beyond the back wall, the outside telephone line came into the plant. The first thing it did was go through a special Telephone Surge Protector.
In this picture above, the silver circular buttons on the left side are really an old style surge protector. whenever there was a power surge, the carbon connection in the surge protector would quickly melt causing the circuit to go straight to ground. Thus protecting the rest of the telephone circuit. So, if some kid in their house decides to connect the 120 volts circuit to the telephone for fun to see what would happen, this circuit would protect the rest of the phone circuits. Keep in mind that this was during the early 1990 when “Surge Protection” still was basically all “mechanical”.
Anyway, when I arrived at this panel and I checked the surge protector to the main line going out of the plant, guess what I found…. Yep. Shorted to ground. Luckily there were some spares that were not wired to anything in the panel and I was able to swap them out for the ones that had been destroyed. — These were a one time use. Which meant, if they ever had to short to ground, they had to be replaced.
Ok. Fine. After a little while, we were able to call back out of the plant, though there was still some residual noise on the line. It was like this… when you called out of the plant, the person on the other end sounded like they were buried in a grave somewhere and they were trying to talk to someone living just like in an episode of the Twilight Episode where a phone line landed on a grave and the dead person tried to call his long lost love from the past.
I didn’t give it much thought other than that I figured the 189,000 volt arc to ground must have shorted out the telephone line since the phone line ran directly under the auxiliary substation ground grid.
It wasn’t until the next morning when the Southwestern Bell repairman showed up at the plant. I knew him well, since he had been working on our phone lines since before the AT&T breakup in 1984. When I met him in the front of the electric shop, he said that he needed to check our telephone circuits. I told him that I knew that we had a problem because we had a high voltage short to ground yesterday and I found our surge protectors melted away.
He explained to me that not only was our circuit affected, but that every relay house from here to Ponca City was blown out. That’s when I realized that the problem was the reverse of the usual situation. What had happened was that the Ground Grid in the substation and the surrounding area (including the Unit 1 Main Power Transformer) had become hot. What do you do when the ground grid becomes charged?
The Ground Grid is what is supposed to protect you when a surge happens, but what happens when the ground grid itself is the problem? In this case, when the high voltage line about 60 feet from the telephone cable surge protector, arced to ground, it fed a tremendous amount of power back through the ground grid. when equipment detected the surge in voltage, they automatically defaulted their circuits to ground. That’s why the telephone circuit died. That’s what tripped the Main Power Transformer.
When the telephone circuit detected the high voltage surge, it shorted to ground (which was the problem), causing the high voltage to feed directly into the phone line and down the line to the next Southwestern Bell relay switch, which also defaulted to ground, trying to bleed off the surge as it went from relay switch to switch until enough of the power was able to be diverted to ground.
That day sure turned out to be a learning experience. I learned that when all the lights go out in the control room, that it is almost assured that the coffee pot in the electric shop is going to stop working. I also learned that in order to coax the plant manager to the electric shop, a major electrical tragedy is one good way. I learned that when shooting rusty water into the air don’t point it at a high voltage auxiliary substation switch. — I’m sure Mickey Postman learned that lesson too. I also learned that just like in Star Trek… whenever there is a dangerous job to do, the Captain is always the one that wants to do it. Does that make sense? Send a Peon like me in there…
I also learned something else about Power Plant Men…. You see…. People like Dale Mitchell, George Alley and Mickey Postman all are examples of incredibly wonderful Power Plant Men. When they were out there doing their duty and something tragic like this, all the Power Plant Men felt their pain. They knew that they all felt guilty for tripping the unit. It didn’t matter that a million dollars every so many minutes was walking out the door in revenue. The only thing that mattered was that these three men were safe.
Since I have left the Power Plant, I have found that the idea that the employee is the greatest asset that a company can possess is not a universal idea. You see, there was never the thought that any of these people should be fired for their mistake. On the contrary. The true Power Plant Men did whatever they could to let them know that they knew exactly how they felt. It could have happened to any of them.
Besides the friendship between Power Plant Men, one of the things I miss most about working at the Power Plant is that the employees are held in high esteem as a real asset to the company. Many could learn from their example.
Comments from the Original post
-
-
That was an exciting day! Another great story. Thanks for the memories.
-
-
-
I like the mix of storytelling and information sharing you deliver here. Thanks again
-
-
-
Aug 8, 2011 I lost all reserve in and lost both units in 2 separate storms and A1 would not start for a few minutes and A2 was leaking antifreeze terribly not a scratch and back online in 34 hours both units and no one ever asked me one question even with a Safety Dept not one question asked of me the SS on duty. Not many men on the planet have ever experienced an uncontrolled total plant outage- you would of thought a learning opportunity would of took place. Feb 2011 worst winter temps in years 50 Units or more tripped in Texas let alone the trusty units of Redbud and McClain were fighting Sooner rolled right along with storm warnings for two weeks ahead – the ICS still went to Detroit for just tours of other facilities once again the fall guy Tarver McArthur stood alone. I had authored a Freeze Protection Plan for the plant and that seemed to save the day and explain to the regulatory bodies how we were online and everyone else in Texas was off and enjoying rolling blackouts in a terrible winter weather situation not to mention our powers that be were all stranded in Detroit and very few people could get to the plant without getting stuck trying to get there as well – but a few health heart issues later I am still here to tell about it all you would think folks would want to take advantage of someone that had went through the fire and Ice but thats ok I want them someday distant to get all the credit they deserve when the trumpets sound as that is truly what matters most. DT
-
-
Great story, and yes, you took exactly the proper lesson from it, and it is too bad that many of our bosses haven’t learned it.
And yup, I’ve buried a lot of electrocuted squirrels over the years.
From Power Plant Rags To Riches
Originally posted on March 9, 2013:
There is one item that all Oklahoma power plant men carry with them almost every day. Whether they are electricians working on a motor, a mechanic pulling a pump, or an operator making his rounds. All of them carry and use this one item. It is so important that, without it, it would be difficult for the maintenance shop to function properly.
This item of course is a rag from the Chief Wiping Cloth Rag Box:
As an electrician, I used rags all the time. Whether I was working on a breaker, doing battery inspection, elevator maintenance or just looking for a clean place to sit my back side, I had to have a rag from the box of Chief Wiping Cloths. Chief Wiping Cloths come from the Oklahoma Waste & Wiping Rag Company in Oklahoma City.
When I was on the labor crew, I was dirty all the time. I was doing coal clean-up, digging ditches, pouring concrete, shoveling bottom ash and wading through fly ash. I had little reason to stay clean or to clean things. My life was full of dirt and grime. I was always dirty, so much so that when I went into the electric shop in 1983 and Bill Bennett was talking to Charles Foster about who should repair the Manhole pump motors, Bill told Charles, “Let Kevin do it. He enjoys getting dirty.”
I didn’t argue with Bill, because, well…. what was the point. But as an electrician, I not only had desired to have a cleaner job, but I also wished to fulfill Jerry Mitchell’s prophesy that “When I become as good as him, I will be able to remain clean even in the face of “Coal Dust and Fly Ash” (See the post A Power Plant Man Becomes an Unlikely Saint). The boxes of rags were my opportunity.
So, when I left to go on a job, I would always grab at least a couple of rags from the box and put them in my tool bucket and at least one hanging out of my back pocket. That way, if I needed to plop down on the ground to unwire a motor too low to sit on my bucket, I could sit on a rag on the coal dust covered ground instead. This helped my goal of remaining as clean as possible.
It’s funny that years later I should miss the boxes of rags that I used to use to do my job. There was more to it than just the rags I used to wipe my hands, battery posts, greasy bearings, breaker parts and my nose. You see, these rags were made from recycled clothes. Yes. They were sterilized for our use, but these were from recycled clothes.
Actually, the Oklahoma Waste and Wiping Rag Company, founded in 1940, was one of the largest purchasers of donated clothing in the country. That meant that many of the rags we used in the rag box were actually worn by someone. Sure, a lot of the rags came from defective clothing from factories, but some of the rags had been clothes actually worn by a person.
As odd as it may sound, while I was grabbing rags from the rag box, I was thinking (at times… it wasn’t like it was an obsession with me), that these rags may have been worn by someone for years before ending up covered with bearing grease by my hand and tossed into a proper Fire protection trash can.

Trash cans like this were used because they prevented oily rags from burning down the shop when they would spontaneously combust
So, anyway….. Thinking about how these rags were possibly once worn by people throughout the United States, I felt that some of the rags had a specific connection to some unknown person somewhere. So, I would actually go through the rag box looking for pieces of rags that I felt had been worn by someone before. You know (or maybe you don’t), rags that had an aura around them like someone had once had a “personal relationship” with them.
I would take these rags and I would “pseudo-dress up” in them. So, if it was a rag made out of a pair of pants, I would tuck it in my belt and I would carry it that way until I needed it. In a weird way (and I know… you are thinking a “really weird” way), I would feel connected to the person that had worn this piece of clothing in the past. I felt as if I was honoring their piece of cloth just one last time before I stained it with coal dust, fly ash, or snot, just one last time.
And in my even weirder way, I would sort of pray for that person, whoever they may be. I would even, kind of, thank them for the use of their old clothes (I know, I stretched the English Language in those last two sentences to meet my unusual need).
I have a picture in my mind of myself standing on the platform of the 6A Forced Draft Fan at Muskogee in the fall of 1984 (one year after becoming an electrician), dressing myself up in pieces of clothing from the rag box, all giddy because I had found enough pieces to make an entire outfit made of half male and half female clothing. Ben Davis, who was on overhaul at Muskogee with me from our plant is shaking his head in disbelief that he had to work with such a goof. Not exactly sure who he has been assigned to work with… — I actually felt sorry for Ben. I knew I was a normal person. The trouble was… I was the only person that knew it (For an explanation about where that phrase originated, see the post “Bobbin’ Along with Bob Kennedy“).
Levity is healthy. And at times when stress is at its greatest, levity is a way back to sanity. Just today I was invited to a conference call to discuss something that I was working on, and when I was done, I stayed on the line even though I was no longer needed. As I listened, one person on the other end was remarking about how he enjoyed his team so much because they were able to crack up and reduce the stress by being humorous.
A friend of mine, and fellow teammate Don McClure who had invited me to the call was coming up with one “one-liner” after the other. They were “spot-on” and very funny (as he usually is — ok. He’s going to correct me on the “usually” part). But he said one thing that hit home with me. He said that he had been in the Hot-seat so long that he had to put on a pair of Asbestos underwear.
This, of course, made me immediately think of the asbestos gloves we used to wear in the electric shop before Asbestos had been formerly outlawed. We had an old pair of asbestos gloves from Osage Plant ( to find out more about the Osage Plant read about it in the post Pioneers Of Power Plant Fame Finally Find Peace).
Along with the rags in the rag box, when I used to put on the asbestos gloves I used to think of Howard Chumbley (who died on August 4, 1998 at the age of 70), at the age of 24 working at the Osage Plant, before his hair turned to gray and then to white, wearing these same gloves while he pulled a bearing off of a heater and slapped it onto a motor shaft.
It gave a special meaning to motor repair. Even though Howard retired from plant life in 1985, for years I could put on his old pair of asbestos gloves and feel like I was stepping into his young shoes. I would think… If only I could be a true “Power Plant Man” like Howard…. I love Howard with all my heart, and today, I have never met a better human being than him.
Note that in the picture of Howard’s gravestone it says that he was an EM3 in the Navy. This is an “Electrician’s Mate 3rd Class”. There is no way I was ever going to measure up to Howard. He was a hero to his country and a man of great integrity and humility. If I had saved up all the nice things I had done in my life and done them all on one day, I may have slightly resembled Howard on a regular day. Just like Jim Waller that I had discussed in my last post… Only Men of the greatest integrity measure up to be “True Power Plant Men”.
This made changing the bearings on a motor almost a sacred event to me. I don’t know if the other electricians felt what I felt, but there was something about placing those gloves on my hands that seemed to transform me for a moment into someone noble. I never mentioned it to them (which was odd, because I was usually in the habit of telling them every little crazy thought that entered my head).
I remember at break time one day Margie Belongia (who was a plant janitor at the time) telling me in 1981 when I was a summer help, that she wanted to go to hell because that was where all of her friends would be. I asked her at the time how she was so certain that being in hell guaranteed that she would be able to be with her friends, and she was taken aback by my question. “What do you mean? Why wouldn’t I be with my friend?” — I responded, “Suppose in hell you are alone. With no one but yourself.” I think I unnerved her by my response. She said that she had never considered that. She had counted on being with her friends. They had all decided that was the way it was going to be.
At any rate. I kept her thought in my mind. I hope every day that someday I will be able to walk up behind Howard Chumbley (not in hell of course, the other place) and just stand there and listen to him tell stories about when he worked at the old Osage Plant, and how he used to be up to his elbows in oil that contained PCBs and never thought twice about it. Or how he played a harmless joke on someone dear to him, and he would laugh….
Howard was my foreman for only about 5 months before he retired. I remember sitting in the electric shop office for a year and a half during lunch listening to him tell his stories. He would grin like Andy Griffith and laugh in such a genuine way that you knew that his heart was as pure as his manners.
To this day I know that I have never been richer than I was when I was able to sit in the shop and listen to Howard Chumbley pass on his life experience to us. Even years later when I was able to slip on the pair of Asbestos Gloves worn by him years earlier I could feel that I was following in his footsteps. Just the thought of that would make me proud to be an Electrician in a Power Plant.
I used to imagine that the Chief on the Chief rag boxes knew the history of all the pieces of rags in the box. When I moved to Texas in 2001, I used some sturdy Chief rag boxes when I was packing to leave. They are sturdy boxes. Just this past year, we threw away the last Chief rag box that contained Christmas decorations in exchange for plastic tubs. Even though it seems like a little thing. I miss seeing the Chief on those boxes of rags.
That was an exciting day! Another great story. Thanks for the memories.